1.1 .................... moves to amend H. F. No. 3540, the first engrossment, as follows:
1.2Page 1, delete section 1
1.3Page 2, line 30, reinstate the stricken language
1.4Page 3, line 2, delete everything after "
facility" and insert a period
1.5Page 3, delete lines 3 to 6
1.6Page 3, line 28, after "
are" insert "
, to the extent practicable,"
1.7Page 5, delete section 7 and insert:
1.8 "Sec. 7.
[115A.5591] CONSTRUCTION AND DEMOLITION WASTE
1.9RECYCLING REQUIREMENT.
1.10 Subdivision 1. Requirement. A contractor constructing or demolishing a building
1.11of more than 4,000 square feet located in the seven-county metropolitan area must recycle
1.12or reuse or arrange for the recycling or reuse of 40 percent of the waste, by weight, from
1.13the project. The waste must be recycled on-site or delivered to recycling facilities but
1.14may not be buried on-site.
1.15 Subd. 2. Records. A contractor to whom subdivision 1 applies must maintain
1.16records, including delivery receipts, documenting the disposition of all waste generated by
1.17the project. The contractor must maintain the records for three years. If the contractor is
1.18unable to achieve the 40 percent recycling goal established in subdivision 1, the records
1.19must include an explanation of why the goal was unable to be met.
1.20EFFECTIVE DATE.This section is effective July 1, 2009."
1.21Page 5, after line 16, insert:
1.22 "Sec. 9.
[115A.947] COMPOSTABLE MATERIALS.
1.23 (a) Source-separated compostable materials may be delivered to a mixed municipal
1.24solid waste processing facility or a recycling facility only for the purpose of composting.
1.25 (b) Source-separated compostable materials may be delivered to a transfer station
1.26only for transfer to a facility for the purpose of composting.
2.1 (c) Paragraphs (a) and (b) do not apply if the commissioner has determined that no
2.2other person is willing to accept the source-separated compostable materials.
2.3EFFECTIVE DATE.This section is effective the day following final enactment."
2.4Page 5, line 19, delete "
greenhouse gases" and insert "
energy use"
2.5Page 5, line 20, delete "
..." and insert "
five"
2.6Page 5, line 21, delete "
greenhouse gas emissions" and insert "
energy use"
2.7Page 5, line 25, delete "
; and" and insert "
, except that a project that collects materials
2.8in Minnesota for recycling may recycle the materials in another state;"
2.9Page 5, line 27, delete the period and insert "
; and"
2.10Page 5, after line 27, insert:
2.11 "
(4) the project meets the requirements of section 216B.241 regarding conservation
2.12improvement expenditures."
2.13Page 5, line 28, after "
eligible" insert "
under paragraph (a)" and delete "
as offsets"
2.14and delete everything after "
to"
2.15Page 5, line 29, delete everything before the colon
2.16Page 5, line 32, after "
generators" insert "
or from construction and demolition
2.17projects"
2.18Page 6, line 1, delete "
and" and insert "
or"
2.19Page 7, after line 13, insert:
2.20 "
(g) This subdivision does not apply to an organization certified by the Internal
2.21Revenue Service as exempt from federal income tax under section 501(c)(4) of the
2.22Internal Revenue Code."
2.23Page 7, line 20, delete "
the day following final enactment" and insert "
July 1, 2009"
2.24Renumber the sections in sequence and correct the internal references
2.25Amend the title accordingly