1.1.................... moves to amend H.F. No. 956, the delete everything amendment
1.2(H0956DE3), as follows:
1.3Page 2, line 4, delete everything after "
provided" and insert "
all of the output of the
1.4generating equipment is sold to the utility that serves the consumer and the generation is
1.5located on or contiguous with the real property where the electricity is used."
1.6Page 2, delete line 5
1.7Page 2, line 19, delete "
(a)"
1.8Page 2, line 20, delete "
216C.412" and insert "
216C.411"
1.9Page 2, delete lines 24 to 26
1.10Page 2, delete lines 31 to 33
1.11Page 3, line 1, delete "
(c)" and insert "
(b)"
1.12Page 3, line 3, delete "
(d)" and insert "
(c)"
1.13Page 3, line 6, delete "
(e)" and insert "
(d)"
1.14Page 3, line 8, delete "
(f)" and insert "
(e)"
1.15Page 3, line 12, delete "
(g)" and insert "
(f)"
1.16Page 3, line 18, delete "
(h)" and insert "
(g)"
1.17Page 3, line 20, delete "
(i)" and insert "
(h)"
1.18Page 3, line 21, after "
offsetting" insert "
on-site"
1.19Page 3, line 22, after "
sources" insert "
which has a capacity size no greater than 120
1.20percent of the customer's on-site average annual consumption as determined by the utility"
1.21Page 3, line 23, delete "
(j)" and insert "
(i)"
1.22Page 3, line 24, delete "
(k)" and insert "
(j)"
1.23Page 4, line 4, delete everything after the period
1.24Page 4, delete line 5
1.25Page 5, delete section 8
2.1Page 7, line 31, delete "
not" and insert "
only" and after "
facility" insert "
if the
2.2commission or governing body of the utility determines such charges are needed to ensure
2.3just and reasonable rates"
2.4Page 7, delete section 11
2.5Page 8, delete lines 21 to 25 and insert:
2.6"
(b) A utility may require an owner of a solar photovoltaic net metered facility
2.7to be governed by this section."
2.8Page 8, line 28, delete "
and elects" and insert "
, as needed to comply with the solar
2.9energy standard under section 216B.1691, subdivision 2f."
2.10Page 8, delete line 29
2.11Page 8, line 30, delete everything after "
shall" and insert "
require each public utility
2.12subject to this section to develop a"
2.13Page 8, line 31, delete "
form of"
2.14Page 8, line 32, delete "
who elects to be governed under this section"
2.15Page 8, line 33, delete "
20 years, and" and insert "
the expected operating life of the
2.16device as determined by the commission,"
2.17Page 8, line 34, after "
section" insert "
, and must transfer all renewable energy
2.18credits generated by the device to the purchasing utility"
2.19Page 9, line 1, delete "
whose owner"
2.20Page 9, line 2, delete "
elects to be governed under this section"
2.21Page 9, line 6, delete "
(a)"
2.22Page 9, line 9, after "
of" insert "
any direct and quantifiable ratepayer costs avoided
2.23by a solar photovoltaic device on the utility's system, comprised of"
2.24Page 9, line 22, after "
(6)" insert "
any" and delete everything after "
benefits" and
2.25insert "
attributable to the solar generation."
2.26Page 9, delete lines 23 to 28
2.27Page 10, line 9, delete "
elects to receive" and insert "
receives"
2.28Page 10, line 19, after the period, insert "
The owner of the solar photovoltaic device
2.29is responsible for the cost of the meter provided."
2.30Page 10, delete lines 33 and 34
2.31Page 13, delete lines 30 and 31
2.32Page 13, delete section 17
2.33Page 17, line 29, delete "
device" and insert "
net metered facility"
2.34Page 18, delete lines 4 and 5
2.35Page 18, line 12, delete "
20" and insert "
ten"
3.1Page 18, line 17, after "
price" insert "
to be" and delete "
in this subdivision" and
3.2insert "
by the commissioner"
3.3Page 18, delete lines 24 to 31
3.4Page 21, line 20, after the period, insert "
A public utility may recover costs incurred
3.5for this study through an annual adjustment of charges provided under Minnesota Statutes,
3.6section 216B.1645, subdivision 2."
3.7Renumber the sections in sequence and correct the internal references
3.8Amend the title accordingly